Long Lead-acid Battery WP22-12NE M6, 12V 22Ah, cycle-resistant (PU2)

€72.60 *
Available in 14 days
Long Lead-acid Battery WP22-12NE M6, 12V 22Ah, cycle-resistant (PU2)
PB-Akku Long WP22-12NE M6
The maintenance-free LONG lead-acid battery WP12-22NE (OEM No.: WP22-12NE) is ideal for a wide range of applications, such as powering security and alarm systems, emergency power supplies, medical equipment or industrial machinery. The battery has a service life of 3–5 years, is protected against deep discharge (although this should be avoided) and is cycle-resistant. Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery is easy to install thanks to an M6 screw terminal.
Technical data:
Type: Lead
Voltage: 12V
Capacity: 22Ah
Dimensions: 181 mm long x 76 mm wide x 167 mm high
Weight: 6.9 kg
Material: ABS UL94 HB
Connection: M6 screw terminal
Price per battery. Pack of 2
Suitable for electric wheelchairs / scooters: Electric Mobility VEO / VEO X
| Weitere Spezifikationen | |
|---|---|
| Brand | Long |
| Capacity | 22.000mAh |
| Contact | M6 internal thread |
| Eigenschaft | cycle-resistant |
| Height | 167mm |
| Highlights | 24 month warranty long service life with low self-discharge maintenance-free AGM technology robust housing and refined contacts |
| Length | 181mm |
| Manufacturer | Long |
| Product type | battery |
| Type | lead |
| Voltage | 12V |
| Weight | 6,9kg |
| Width | 76mm |
Similar Products









