Long Lead-Acid battery WP22-12N, 12V 22Ah, M6 Bolt (PU2)

€61.46 *
Available in 7 days
Long Lead-Acid battery WP22-12N, 12V 22Ah, M6 Bolt (PU2)
PB Battery Long WP Series Standby 6V DC / 1Ah WP22-12N
The maintenance-free LONG lead-acid battery WP12-22N (OEM No.: WP22-12N) is suitable for a wide range of applications, such as powering security and alarm systems, emergency power supplies, medical equipment or industrial applications. The battery has a service life of up to 5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to an M6 screw cap.
Technical data:
Type: Lead
Voltage: 12V
Capacity: 22Ah
Dimensions: 181x76x167mm (LxWxH)
Weight: 6.9kg
Connection: M6 screw terminal
Material: ABS UL94 HB
| Weitere Spezifikationen | |
|---|---|
| Brand | Long |
| Capacity | 22.000mAh |
| Contact | M6 internal thread |
| Height | 167mm |
| Highlights | 24 month warranty long service life with low self-discharge maintenance-free AGM technology robust housing and refined contacts |
| Length | 181mm |
| Manufacturer | Long |
| Product type | battery |
| Type | lead |
| Voltage | 12V |
| Weight | 6,9kg |
| Width | 76mm |
Similar Products











