Long lead-acid battery WP12-12A F2, 12V 12Ah VDS 6.3mm contacts (PU4)

€31.00 *
Available in 7 days
Long lead-acid battery WP12-12A F2, 12V 12Ah VDS 6.3mm contacts (PU4)
PB-Akku Long WP12-12A-F2 6V DC / 1Ah
The maintenance-free LONG lead-acid battery WP12-12A (OEM No.: WP12-12A F2) is VDS-certified and is therefore ideal for powering security and alarm systems, for emergency power supply, medical equipment or industrial applications. The battery has a service life of 3–5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to a Faston connector (6.3 mm).
Technical data:
Type: Lead
Voltage: 12V
Capacity: 12Ah
Dimensions: 151x98x93 (LxWxH)
Weight: 3.75kg
Contacts: 6.3mm
Material: ABS UL94 HB
Price per battery. PU4
| Weitere Spezifikationen | |
|---|---|
| Brand | Long |
| Capacity | 12.000mAh |
| Contact | 6,3mm Faston |
| Height | 93mm |
| Highlights | 24 month warranty long service life with low self-discharge maintenance-free AGM technology robust housing and refined contacts |
| Length | 151mm |
| Manufacturer | Long |
| Product type | battery |
| Type | lead |
| Voltage | 12V |
| Weight | 3,75kg |
| Width | 98mm |
Similar Products









