Skip to main content Skip to search Skip to main navigation

Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)

Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long
long service life with low self-discharge
robust housing and refined contacts
24 month warranty
high-rate AGM technology

Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)

Long WP1236W lead-acid battery – 12V/9Ah 6.35mm

The maintenance-free LONG WP1236W lead-acid battery (OEM No.: WP1236W) is suitable for high-current and standby applications, for example in security and alarm systems, emergency power supplies, medical technology or industrial applications. The battery has a service life of 3–5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3 per cent per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to an nF2 connector (6.35 mm).

Technical specifications:

Type: Lead

Voltage: 12V

Capacity: 9Ah/36W

Dimensions: 151mm long x 65mm wide x 94mm high

Weight: 2.7kg

Connector: 6.35mm

Material: ABS UL94 HB

Price per battery. Pack of 5

Weitere Spezifikationen
Brand Long
Capacity 9000mAh
Contact 6,3mm Faston
Height 94mm
Highlights 24 month warranty
high-rate AGM technology
long service life with low self-discharge
robust housing and refined contacts
Length 151mm
Manufacturer Long
Product type battery
Type lead
Voltage 12V
Weight 2,7kg
Width 65mm

Similar Products

Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available in 7 days

Product no.: WP12-3300
€17.33 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available in 7 days

Product no.: WP7-6S
€22.05 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12, 12V 1,2Ah (PU20)
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€29.19 *
Lead acid battery Long WP4.5-6
Lead acid battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2, 12V 12Ah VDS 6.3mm contacts (PU4)
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP22-12N
Long Lead-Acid battery WP22-12N, 12V 22Ah, M6 Bolt (PU2)
Product no.: WP12-22N | EAN: 4260201686922 | Manufacturer: Long

Available in 7 days

Product no.: WP12-22N
€61.46 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available in 7 days

Product no.: WP12-3300
€17.33 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available in 7 days

Product no.: WP7-6S
€22.05 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12, 12V 1,2Ah (PU20)
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€29.19 *
Lead acid battery Long WP4.5-6
Lead acid battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2, 12V 12Ah VDS 6.3mm contacts (PU4)
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP22-12N
Long Lead-Acid battery WP22-12N, 12V 22Ah, M6 Bolt (PU2)
Product no.: WP12-22N | EAN: 4260201686922 | Manufacturer: Long

Available in 7 days

Product no.: WP12-22N
€61.46 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.