Skip to main content Skip to search Skip to main navigation

Long Lead-Acid Battery WP1.2-12, 12V 1,2Ah (PU20)

Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
24 month warranty

Long Lead-Acid Battery WP1.2-12, 12V 1,2Ah (PU20)

Long WP1.2-12 lead-acid battery, 12V 1200mAh

The maintenance-free LONG WP12-1200 lead-acid battery (OEM No.: WP1.2-12) is VDS-certified, making it ideal for powering security and alarm systems, emergency power supplies, medical equipment or industrial applications. The battery has a service life of 3–5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to a Faston connector (4.8 mm).

Technical data: 

Type: Lead

Voltage: 12V

Capacity: 1.2Ah

Dimensions: 97mm long x 43mm wide x 53mm high

Weight: 564g

Contacts: 4.75mm

Material: ABS UL94 HB

Price per battery. PU20

Weitere Spezifikationen
Brand Long
Capacity 1200mAh
Contact 4,75mm Faston
Height 53mm
Highlights 24 month warranty
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
Length 97mm
Manufacturer Long
Product type battery
Type lead
Voltage 12V
Weight 564g
Width 43mm

Similar Products

Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available in 7 days

Product no.: WP12-3300
€17.30 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available in 7 days

Product no.: WP7-6S
€22.10 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.90 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€29.20 *
Lead acid battery Long WP4.5-6
Lead acid battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.20 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2, 12V 12Ah VDS 6.3mm contacts (PU4)
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€31.00 *
Long Lead-Acid battery WP22-12N
Long Lead-Acid battery WP22-12N, 12V 22Ah, M6 Bolt (PU2)
Product no.: WP12-22N | EAN: 4260201686922 | Manufacturer: Long

Available in 7 days

Product no.: WP12-22N
€61.50 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.40 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available in 7 days

Product no.: WP12-3300
€17.30 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available in 7 days

Product no.: WP7-6S
€22.10 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.90 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€29.20 *
Lead acid battery Long WP4.5-6
Lead acid battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.20 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2, 12V 12Ah VDS 6.3mm contacts (PU4)
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€31.00 *
Long Lead-Acid battery WP22-12N
Long Lead-Acid battery WP22-12N, 12V 22Ah, M6 Bolt (PU2)
Product no.: WP12-22N | EAN: 4260201686922 | Manufacturer: Long

Available in 7 days

Product no.: WP12-22N
€61.50 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.40 *

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.