Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6

€125.44 *
Available in 7 days
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Long WP50-12NE lead-acid battery with M6 screw terminals
The maintenance-free LONG WP12-50NE lead-acid battery (OEM No.: WP50-12NE) is suitable for powering security and alarm systems, emergency power supplies, medical equipment or industrial applications. The battery has a service life of 3–5 years, is protected against deep discharge (although this should be avoided) and is cycle-resistant. Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to an M6 screw terminal.
Technical data:
Type: Lead
Voltage: 12V
Capacity: 50Ah
Dimensions: 199x166x171mm (LxWxH)
Weight: 15.1kg
Material: ABS UL94 HB
Connection: M6 screw terminal
| Weitere Spezifikationen | |
|---|---|
| Brand | Long |
| Capacity | 50.000mAh |
| Contact | M6 internal thread |
| Height | 171mm |
| Highlights | 12 month warranty long service life with low self-discharge maintenance-free AGM technology robust housing and refined contacts |
| Length | 199mm |
| Manufacturer | Long |
| Product type | battery |
| Type | lead |
| Voltage | 12V |
| Weight | 15,1kg |
| Width | 166mm |
Similar Products









