Long Lead-Acid battery WP2.6-12 – 12 V, 2,6 Ah

€15.10 *
Available in 7 days
Long Lead-Acid battery WP2.6-12 – 12 V, 2,6 Ah
Long WP Series 6V DC / 1Ah Standby Lead-Acid Battery WP2.6-12
The maintenance-free LONG lead-acid battery WP12-2600 (OEM No.: WP2.6-12) is suitable for a wide range of applications, such as powering security and alarm systems, emergency power supplies, medical equipment or industrial applications. The battery has a service life of 3–5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install via a Faston connector (4.8 mm).
Technical data:
Type: Lead
Voltage: 12V
Capacity: 2.6Ah
Dimensions: 178x35x60mm (LxWxH)
Weight: 1kg
Terminals: 4.75mm
Material: ABS UL94 HB
Price per battery. Pack of 10
| Weitere Spezifikationen | |
|---|---|
| Brand | Long |
| Capacity | 2600mAh |
| Contact | 4,75mm Faston |
| Height | 60mm |
| Highlights | 24 month warranty long service life with low self-discharge maintenance-free AGM technology robust housing and refined contacts |
| Length | 178mm |
| Manufacturer | Long |
| Product type | battery |
| Type | lead |
| Voltage | 12V |
| Weight | 1000g |
| Width | 34,5mm |
Similar Products









