Long Lead-Acid battery WP18-12SHR 12V, 18Ah VDS (PU2)

€51.66 *
Available in 7 days
Long Lead-Acid battery WP18-12SHR 12V, 18Ah VDS (PU2)
PB-Akku Long WP18-12SHR-M - 12V/18Ah (VdS)
The maintenance-free LONG lead-acid battery WP12-18SHR is VdS certified and is therefore ideal for powering security and alarm systems, emergency power supplies, medical equipment or industrial applications. The battery has a service life of 3–5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to an F3 / M5 flat-pin connection.
Technical data:
Type: Lead [Pb]
Voltage: 12V
Capacity: 18Ah
Terminals: F3 / M5 flat-pin
VdS: G114033
Dimensions: 181x76x167mm (LxWxH)
Weight: 5.6kg
Price per battery. Pack of 2
| Weitere Spezifikationen | |
|---|---|
| Brand | Long |
| Capacity | 18.000mAh |
| Contact | F3 / M5 flat terminal |
| Height | 167mm |
| Highlights | 24 month warranty long service life with low self-discharge maintenance-free AGM technology robust housing and refined contacts |
| Length | 181mm |
| Manufacturer | Long |
| Product type | battery |
| Type | lead |
| Vds | Ja |
| Voltage | 12V |
| Weight | 5,6kg |
| Width | 76mm |
Similar Products










