Long Lead-acid Battery WP0.8-12S - 12V 0.8Ah - JST connector

€18.06 *
Available in 7 days
Long Lead-acid Battery WP0.8-12S - 12V 0.8Ah - JST connector
Long lead-acid battery WP0,8-12S with JST connector
The maintenance-free LONG WP12-800 lead-acid battery (OEM no.: WP0.8-12S) is ideal for powering security and alarm systems, emergency power supplies, medical equipment or industrial applications (not VdS certified). The battery has a service life of 3–5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and features a JST connector.
Technical data:
Type: PB battery with JST connector
Voltage: 12V
Capacity: 800mAh
VDS: no
Dimensions: 96 x 25 x 62mm (LxWxH)
Weight: approx. 364g
OEM No.: WP0, 8-12S
Connector: JST
Technology: Lead-matt (AGM)
Price per battery. Pack of 20
| Weitere Spezifikationen | |
|---|---|
| Brand | Long |
| Capacity | 800mAh |
| Contact | JST plug |
| Height | 62mm |
| Highlights | 24 month warranty long service life with low self-discharge maintenance-free AGM technology robust housing and refined contacts |
| Length | 96mm |
| Manufacturer | Long |
| Product type | battery |
| Type | lead |
| Voltage | 12V |
| Weight | 364g |
| Width | 25mm |
Similar Products










