Skip to main content Skip to search Skip to main navigation

Long lead-acid battery KPH75-12NE – 12V 75Ah – suitable for repeated charging and discharging

Product no.: WP12-75NE | EAN: 4260201687257 | Manufacturer: Long
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
24 month warranty

Long lead-acid battery KPH75-12NE – 12V 75Ah – suitable for repeated charging and discharging

Lead-acid battery Long WP-KPH75-12NE 12V/75Ah

The maintenance-free LONG lead-acid battery WP12-75NE (OEM No.: KPH75-12NE) is suitable for a wide range of applications, such as powering security and alarm systems, emergency power supplies, medical equipment or industrial machinery. The battery has a particularly long service life of 10–12 years, is protected against deep discharge (although this should be avoided) and is cycle-resistant. Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to an M6 screw terminal.

Technical specifications:

Type: Lead

Voltage: 12V

Capacity: 75Ah

Dimensions: 260x170x202mm (LxWxH)

Weight: 24.4kg

Connection: M6 screw terminal

Service life: 10–12 years

Compatible with the following electric wheelchairs / scooters:

ICARE models: 
- XTREME X8
- FRONTIER V6
- M1 MINI CROSSER
- OFFROAD V4
- Partner R44
- Q6 ULTRA

INVAVARE models:
- ARROW XT
- COMET
- G50
- Quantum R4000
- TDX SP2
- TOPAN

OTTIBOOK models:
- B600
- XENO

PERMOBIL models:
- C400
- M400 CORPUS 3G
- X850 CORPUS 3G

SUNRISE models:
- SALSA M2
- QUICK JIVE M

VERMEIREN models:
- CARPO 4
- FOREST 3 LIFT
- FOREST 3SU
- TRACER GT
- SQUOD SU
- NAVIX
- TIMIX

YOU Q models:
- ALEX QLASS SHORTBASE
- ALEX QLASS TRACTION
- LUCA / EQLASS

Compatible with MEYRA FRE ICHAIR MC2

Weitere Spezifikationen
Brand Long
Capacity 75.000mAh
Contact M6 internal thread
Height 202mm
Highlights 24 month warranty
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
Length 260mm
Product type battery
Service life 12 years
Type lead
Voltage 12V
Weight 24,4kg
Width 170mm

Similar Products

Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available in 7 days

Product no.: WP12-3300
€17.33 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available in 7 days

Product no.: WP7-6S
€22.05 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.85 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12, 12V 1,2Ah (PU20)
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€29.19 *
Lead acid battery Long WP4.5-6
Lead acid battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2, 12V 12Ah VDS 6.3mm contacts (PU4)
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP22-12N
Long Lead-Acid battery WP22-12N, 12V 22Ah, M6 Bolt (PU2)
Product no.: WP12-22N | EAN: 4260201686922 | Manufacturer: Long

Available in 7 days

Product no.: WP12-22N
€61.46 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available in 7 days

Product no.: WP12-3300
€17.33 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available in 7 days

Product no.: WP7-6S
€22.05 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available in 7 days

Product no.: WP1236W
€25.85 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12, 12V 1,2Ah (PU20)
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€29.19 *
Lead acid battery Long WP4.5-6
Lead acid battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2, 12V 12Ah VDS 6.3mm contacts (PU4)
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP22-12N
Long Lead-Acid battery WP22-12N, 12V 22Ah, M6 Bolt (PU2)
Product no.: WP12-22N | EAN: 4260201686922 | Manufacturer: Long

Available in 7 days

Product no.: WP12-22N
€61.46 *

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.