Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah

€12.08 *
Available in 7 days
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Long WP1.2-12 lead-acid battery, 12V 1200mAh
The maintenance-free LONG WP12-1200 lead-acid battery (OEM No.: WP1.2-12) is VDS-certified, making it ideal for powering security and alarm systems, emergency power supplies, medical equipment or industrial applications. The battery has a service life of 3–5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to a Faston connector (4.8 mm).
Technical data:
Type: Lead
Voltage: 12V
Capacity: 1.2Ah
Dimensions: 97mm long x 43mm wide x 53mm high
Weight: 564g
Contacts: 4.75mm
Material: ABS UL94 HB
| Weitere Spezifikationen | |
|---|---|
| Brand | Long |
| Capacity | 1200mAh |
| Contact | 4,75mm Faston |
| Height | 53mm |
| Highlights | 12 month warranty long service life with low self-discharge maintenance-free AGM technology robust housing and refined contacts |
| Length | 97mm |
| Manufacturer | Long |
| Product type | battery |
| Type | lead |
| Voltage | 12V |
| Weight | 564g |
| Width | 43mm |
Similar Products









