Skip to main content Skip to search Skip to main navigation

Long Lead-acid battery WP2.2-12 – 12 V, 2,2 Ah – VDS

Product no.: WP12-2200 | EAN: 4260201687134 | Manufacturer: Long
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
12 month warranty

Long Lead-acid battery WP2.2-12 – 12 V, 2,2 Ah – VDS

Long Lead-Acid Battery WP2.2-12

Type: Lead [PB]

Voltage: 12V

Capacity: 2,200mAh

Dimensions: 178mm x 34mm x 60mm (LxWxH)

Weight: 1.04kg

Terminals: 4.75mm

The maintenance-free LONG lead-acid battery WP12-2200 (OEM No.: WP2.2-12) is VDS certified and is therefore ideal for powering security and alarm systems, for emergency power supply, medical technology or industrial applications. The battery has a service life of 3–5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to a Faston connector (4.8 mm).
 

Weitere Spezifikationen
Brand Long
Capacity 2200mAh
Contact 4,75mm Faston
Height 60mm
Highlights 12 month warranty
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
Length 178mm
Product type battery
Type lead
Voltage 12V
Weight 1,04kg
Width 34mm

Similar Products

 Long WP7-6S lead-acid battery
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available

Product no.: WP7-6S
€22.05 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available

Product no.: WP1236W
€25.85 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€29.19 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available in 7 days

Product no.: WP12-3300
€17.33 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available

Product no.: WP7-6S
€22.05 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available

Product no.: WP1236W
€25.85 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available in 7 days

Product no.: WP12-7200-F2
€29.19 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available in 7 days

Product no.: WP12-3300
€17.33 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.


Skip product gallery

Alternative

Multipower Lead-Acid battery MP2,3-12
Multipower Lead-Acid battery MP2,3-12 – 12 V, 2,3 Ah (VdS)
Product no.: MPB12-2200 | EAN: 4260476411779

Available

Product no.: MPB12-2200
€11.03 *