Skip to main content Skip to search Skip to main navigation

Long Lead-Acid battery WP22-12N - 12V 22Ah - M6 Bolt

Product no.: WP12-22N | EAN: 4260201686922 | Manufacturer: Long
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
12 month warranty

Long Lead-Acid battery WP22-12N - 12V 22Ah - M6 Bolt

PB Battery Long WP Series Standby 6V DC / 1Ah WP22-12N

The maintenance-free LONG lead-acid battery WP12-22N (OEM No.: WP22-12N) is suitable for a wide range of applications, such as powering security and alarm systems, emergency power supplies, medical equipment or industrial applications. The battery has a service life of up to 5 years and is protected against deep discharge (although this should be avoided). Thanks to electrodes made from a special antimony-free lead alloy, the battery’s self-discharge rate is less than 3% per month. The casing is made of corrosion- and ageing-resistant plastic and is impact- and break-resistant. The battery can be operated in any position and is easy to install thanks to an M6 screw cap.

Technical data:

Type: Lead

Voltage: 12V

Capacity: 22Ah

Dimensions: 181x76x167mm (LxWxH)

Weight: 6.9kg

Connection: M6 screw terminal

Material: ABS UL94 HB

Weitere Spezifikationen
Brand Long
Breite 76mm
Capacity 22.000mAh
Height 167mm
Highlights 12 month warranty
long service life with low self-discharge
maintenance-free AGM technology
robust housing and refined contacts
Kontakt M6 internal thread
Length 181mm
Manufacturer Long
Product type battery
Type lead
Voltage 12V
Weight 6,9kg

Similar Products

Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available

Product no.: WP1236W
€25.85 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available

Product no.: WP7-6S
€22.05 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available

Product no.: WP12-7200-F2
€19.74 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available

Product no.: WP12-3300
€17.33 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *
Long Lead-acid Battery WP1236W
Long Lead-acid Battery WP1236W - 12V 9Ah (High-current)
Product no.: WP1236W | EAN: 4260201687042 | Manufacturer: Long

Available

Product no.: WP1236W
€25.85 *
 Long WP7-6S lead-acid battery
Lead rechargeable battery (incl. metal surcharge) Long WP Series Standby 6V DC / 1Ah WP7-6S
Product no.: WP7-6S | EAN: 4260201687103 | Manufacturer: Long

Available

Product no.: WP7-6S
€22.05 *
Long Lead-Acid Battery WP1.2-12
Long Lead-Acid Battery WP1.2-12 – 12 V, 1,2 Ah
Product no.: WP12-1200 | EAN: 4260201686885 | Manufacturer: Long

Available in 7 days

Product no.: WP12-1200
€12.08 *
Lead-acid battery Long WP7.2-12-F2
Lead-Acid battery Long WP7.2-12-F2 - 12V/7.2Ah 6.3mm
Product no.: WP12-7200-F2 | EAN: 4260201687011 | Manufacturer: Long

Available

Product no.: WP12-7200-F2
€19.74 *
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Lead rechargeable battery Long WP4.5-6 - 6V/4,5Ah
Product no.: WP6-4500 | EAN: 4260201687165 | Manufacturer: Long

Available in 7 days

Product no.: WP6-4500
€8.24 *
Long Lead-Acid battery WP3.3-12
Long Bleiakku WP3.3-12 – 12V, 3,3Ah
Product no.: WP12-3300 | EAN: 4260201686960 | Manufacturer: Long

Available

Product no.: WP12-3300
€17.33 *
Long lead-acid battery WP12-12A F2 – 12V 12Ah
Long lead-acid battery WP12-12A F2 – 12V 12Ah – VDS 6.3mm contacts
Product no.: WP12-12A | EAN: 4260201686892 | Manufacturer: Long

Available in 7 days

Product no.: WP12-12A
€30.98 *
Long Lead-Acid battery WP50-12NE
Long Lead-Acid battery WP50-12NE – 12V, 50Ah, M6
Product no.: WP12-50NE | EAN: 4260201686984 | Manufacturer: Long

Available in 7 days

Product no.: WP12-50NE
€125.44 *

0 of 0 reviews

Average rating of 0 out of 5 stars

Leave a review!

Share your experiences with other customers.


Skip product gallery

Customers also bought

Rechargeable NiMH battery for Kenwood TK280, TK290, FUG11B, TK380, TK480, TK481
Rechargeable NiMH battery for Kenwood TK280, TK290, FUG11B, TK380, TK480, TK481 - 7,2V/2,0Ah
Product no.: R56217MH | EAN: 4260201682047

Available

Product no.: R56217MH
€18.06 *
Panasonic Li-Me button cell, L14, CR2032
Li-Me button cell, Panasonic, CR2032, L14, 5004LC, DL2032, 3V, 0,22Ah
Product no.: CR2032P | EAN: 4260201688001

Available

Product no.: CR2032P
€0.49 *
10 Varta batteries Micro, AAA, LR03, MN2400, 4003 Industrial Alkaline
Varta batteries Micro, AAA, LR03, MN2400, 4003 Industrial Alkaline, 1.5V
Product no.: VA2400N | EAN: 4260201686847

Available

Product no.: VA2400N
Content: 1 Stück
€0.31 *
4 Varta Mignon AA batteries, LR06, MN1500, 4006 Industrial Alkaline
Battery Varta Mignon, AA, LR06, MN1500, 4006 Industrial Alkaline - 1,5V (VE4)
Product no.: VA1500 | EAN: 4008496356553

Available

Product no.: VA1500
€0.30 *
Battery for Kenwood TK290-11B
NiMH battery for KENWOOD TK 290-11B - 7.2V / 1.6Ah (KNB-21N) with lugs
Product no.: R56221MH | EAN: 4260201682085

Available

Product no.: R56221MH
Content: 1 ST
€31.50 *
Panasonic button cell, CR2025, L12, 3V battery
Li-Me button cell, Panasonic CR2025, DL2025, ECR2025, L12, 5003LC, 3V
Product no.: CR2025 | EAN: 4260201683907

Available

Product no.: CR2025
€0.49 *